Maintenance of HVAC Systems
Project Summary
This project was executed at the Ghazlan Power Plant with MARCO Juffali as the main contractor. The scope involved the replacement of all HVAC system diffusers along with their respective plenum boxes, requiring careful dismantling, fabrication compatibility checks, and precise installation.
​
Given the tight shutdown schedule and critical operational environment, all works were executed with strict coordination, dust control, and adherence to plant safety protocols. The project demanded precise alignment, airtight duct connections, and performance verification to ensure optimal airflow distribution and system efficiency post-installation.